Old Arabi and the renovation cycle
Old Arabi is a grid of shotgun and creole cottages that have been rebuilt, raised and rebuilt again since the levee failures. An Arabi renovation takes a single standard unit at the front curb, because these lots run deep and narrow with no side access at all. Crews working an Arabi house often stay six months or more on a full gut and raise.
Pier and foundation work is the constant in Arabi, where houses settle unevenly on soft delta ground. Those Arabi jobs leave the yard unusable, so the unit sits where the truck can reach it from the street the entire time.
Refinery and river work at Arabi
The sugar refinery on the Arabi riverfront runs maintenance work on its own schedule with contractor crews coming in for defined windows. An Arabi plant placement sits on the paved contractor lot with access arranged ahead of each service visit.
River levee and floodwall projects give Arabi its other industrial rhythm as the corps and the parish keep the system inspected. Those Arabi units go on the crown road where a truck holds firm ground rather than on the batture below.
Drainage, pumps and Arabi weather
Arabi sits below sea level behind the levee, and every drop of rain leaves by pump rather than by gravity. We keep Arabi units out of the low blocks that pond first, because a summer storm can leave water standing for hours.
Hurricane season reshapes the Arabi calendar each year, with pre-storm pickups and post-storm cleanup both moving fast. An Arabi cleanup crew gets a unit as soon as the route reopens, set at the curb where the debris pile is not blocking access.
